Hi
I have an old peoples home that I do work for, called out to black out. The main fuse blown, holder pretty well cooked. DNO have replaced cut out and installed a voltage recorder which is showing several spikes around meal times which are approaching or exceeding the 80A main fuse. Opinions requested, do I suggest a two phase supply and split the load?
I have an old peoples home that I do work for, called out to black out. The main fuse blown, holder pretty well cooked. DNO have replaced cut out and installed a voltage recorder which is showing several spikes around meal times which are approaching or exceeding the 80A main fuse. Opinions requested, do I suggest a two phase supply and split the load?