    Did a job last week, DNO added new 80A fuse and isolator, so I’ve tailed into new IP rated box that has 80A 60898 MCB that feeds another distribution unit, what certificate would you of done?
     
  2. FLICK
    Offline

    FLICK Electrician's Arms

    Location:
    Essex
    If I’m reading this right it would be an EIC
     
  3. Bradley6969
    Offline

    Bradley6969 Regular EF Member

    Location:
    London
    Sorry not a lot of info, 16mm tails and earth from isolator from DNO meter box to another little IP rated outside box which has 80A dp MCB which then SWA feeds another Distribution box for sub circuits
     
  4. FLICK
    Offline

    FLICK Electrician's Arms

    Location:
    Essex
    So you’ve added this cabling and mcb?
     
  5. Bradley6969
    Offline

    Bradley6969 Regular EF Member

    Location:
    London
    SWA wasn’t long enough and no joints kits so made IP rated box with switch and some tails and I’ve done EIC was checking
     
  6. FLICK
    Offline

    FLICK Electrician's Arms

    Location:
    Essex
    Yea mate EIC it is.
     
  7. Bradley6969
    Offline

    Bradley6969 Regular EF Member

    Location:
    London
    Oh no sorry cabling was already there, but they had new DNO cable put in I just added switch and tested
     
  8. Bradley6969
    Offline

    Bradley6969 Regular EF Member

    Location:
    London
    Thank you mate
     
  9. Ian1981
    Offline

    Ian1981 Forum Mentor

    Location:
    North east
    I’d have added a BS88 fuse /switch fuse isolator rather than a circuit breaker for better selectively of downstream circuits
     
    • Like Like x 1
  10. Bradley6969
    Offline

    Bradley6969 Regular EF Member

    Location:
    London
    Yeah true, although downstream has upfront 300mA RCD so no issues thanks anyway
     
Loading...
Similar Threads - certificate Forum Date
Electrical Installation Condition Report, not a Certificate Periodic Inspection Reporting & Certification Apr 14, 2019
Certificate Required? Electrical Wiring, Theories and Regulations Apr 9, 2019

Share This Page

Electricians Directory Post a Domestic Job Post a Commercial Job