Hi Guys,

Currently on a 3MW Solar farm job and will soon be coming up to the testing stage of the project. My question is, where do you do your test? There are String boxes at the end of every row, with isolators inside them for local isolation. There are then duct grade single core cables that go underground and back to the golden table where the combiner boxes and inverters are.

Do i do my testing at the end of the table in the string boxes so i can attach the earth cable to the mounting frame? Or do i do my tests at the combiner boxes as that is the final point for the strings, only there would be no test to earth?

Thanks in advance.
 

Reply to Testing with String Boxes and Combiner Boxes in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top