OP
- Reaction score
- 1
So the contract states 3kW, whereas my (typical) townhouse has 5.75kW. Im going to up the supply to 5ish kW for the 3buildings.
One will be a (simple) workshop, another just needs lights, the third may turn into a home in the far future. From what i´ve read the house best have a 30A, the shed only needs a 20A, and the outhouse only a 10A.
Should i bother with fused disconnects, or just splice all 3 buildings to the meter...
(please stop suggesting a local sparky - as i have mentioned the local sparkys are not inspire trust. They insist on a 2 wire system, whereas i want a proper third earth. Its the back of beyond and i cant be more specific. Shouldnt matter to the experts)
One will be a (simple) workshop, another just needs lights, the third may turn into a home in the far future. From what i´ve read the house best have a 30A, the shed only needs a 20A, and the outhouse only a 10A.
Should i bother with fused disconnects, or just splice all 3 buildings to the meter...
(please stop suggesting a local sparky - as i have mentioned the local sparkys are not inspire trust. They insist on a 2 wire system, whereas i want a proper third earth. Its the back of beyond and i cant be more specific. Shouldnt matter to the experts)