Fully understand what you are saying but the smoke alarms and the emergency lights were requested by an outside company who were brought in to advise on the type and position, and in both cases specified equipement of a lower standard than those of which we are installing plus we are installing...
Monthly emergency lighting checklist
All emergency lighting tests require the mains supply to be switched off, so it is important to plan ahead to avoid disruption.
The monthly check can be conducted by following these steps:
Switch off the mains to your lighting system.
Use the specialist...
Thanks for your reply as the Lights are Emergency lights I'd assume that the lux level would be correct but failing that I have a LUX app on my phone.
I can't see there being a problem with turning off all the lights as this would be done in the daytime when the tenants were at work so no...
Cheers for that I'll look it up
1595093998
Just Googled both numbers and neither say that you can or can not use the wiring for the emergency lighting in such a way that when testing, the whole lighting circuit is shut off.
BS5226 just suggests that if you cannot add a key switch then you can...
Morning Gentlemen
Question we are replacing a consumer unit for a landlord and he's been advised by another company to fit
EI164RC smoke alarms and the wireless bases, but I've been told these are being discontinued so we are fitting the AICO EI3024 MULTI-SENSOR FIRE ALARM with the smartlink...
Sorry my fault i Jumped in on an old thread and started to ask questions about fitting an upfront RCD, whereas it might have been better to start a new thread
Thanks for you reply but can you answer my other question which was if the RCD should not trip other circuits then how come we fit split load boards?
confussed
1593442977
Very true but we are often accused of stitching the customer up so knowing its an old board with no RCD fitted and if we are...
How funny I've just been having this discussion with my knowledgeable supplier as I have to do and EICR on a 7 way wylex board with no RCD and he said as I can't prove that the cables are deeper than 50mm and the customer does not want to a new board then he suggested an up front RCD.
I've just...
Not sure if I've confused matters but the supply for the "shed" will be 3 core SWA only one live this will be fed via a fused isolation switch in the house with a consumer unit in the "shed"
They are having a new combi fitted so no need for an electric shower in the house.
We are asking the DNO to fit a new 100 Amp fuse
and I was going to fit a fused main switch in the house so that they can isolate the "shed" if need be plus to protect the cable.
1591813224
might sound a silly...
I know what you mean but this Shed is going to be used like a small bunglow/office and its the distance from the main house that causes the problem on the cable size
1591792848
So with your help it looks we will be pulling about 88 Amps
so with the fact that some of it is going under ground and...
back
and thank you
realised my mistake feeling very stupid.
but I get the feeling that it might be being used more often than not if you know what I mean.
See top of page though I might be over stating things by adding the heaters rather than including them feel free to let me know
Thanks
1591786838
Don’t know where to add this but sorry I started this early this morning
I’ve confused my 16 and 6 amp breaker as Kw ??????
Will recalculate when I...