Recent content by mikshim

  1. M

    Day 6 of ElectriciansForums.net Advent Calendar

    Excalibur, sword in the stone.
  2. M

    ☃️ Day 1 - ElectriciansForums.net Advent Calendar! Enter Here!!

    Galway bay...….according to everyone else :yum:
  3. M

    Install cert required if eicr has been done

    Why not just do a Zs test for every circuit, to ensure correct polarity & termination after the change, then RCD tests. Zs would be different from original test, because of RCD's, and trip times would have to be recorded anyway.
  4. M

    Advice on this little number! Power and lighting in same switch?

    The only problem I can see is that if it was a three phase installation you may have two different phases resulting in 400V in the switch. Either way a label stating 400V/isolate from two sources would cover everything.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock