Recent content by Slurps

  1. S

    EICR coding for transportable unit

    Thanks, appreciate all of your comments, although this unit is on wheels (at the rear) and towed I think I'll stick with my original coding as placements are usually for months at a time so any movement that may effect the installation is minimal. While I'm at it, any opinions on SY being...
  2. S

    EICR coding for transportable unit

    Yes, not frequently but it does have various locations. It's an NHS Mobile Breast Screening Unit. Don't know exact size but would say around 11m x 2m. Referring to Regualtion 717.52.2
  3. S

    EICR coding for transportable unit

    Hi all, I've recently carried out an EICR on a transportable unit and all circuit wiring has been installed in Twin & Earth. According to regs only flexible cabling should be used due to frequent movement, vibrations etc. I myself wouldn't deem this as needing urgent action and think it would...
  4. S

    Catering Van install - Earthing

    Hi all, back again requiring some transportable building knowledge, this time round a catering/burger van and its earthing arrangment. Was asked to carry out some simple repairs and replacements to a local burger van that is basically static to one location. Fed by a 3kva generator with a16a...
  5. S

    Transportable Building EICR coding/reg question

    Hi all, Just carried out an EICR on a transpotable classroom. Trying to decipher a reg to see if something is compliant. 717.411.1 States automatic disconnection of supply shall be provided by RCD not exceeding 30mA, now does this refer to the site supply (which cannot be certain due to...
  6. S

    EICR for Transportable/Mobile Building

    Thanks for your replies, it's been discussed with the client and agreed that dead tests and a visual wil be sufficient. Seems so BrightSpark, the link to purchase the TCN4 cert was broken so searched through the NIC store and they had this notice in the DPN7 cert description - This report also...
  7. S

    EICR for Transportable/Mobile Building

    Hi guys, Firstly, hello :seeya:, new to the forum. Have been asked recently to carry out an EICR for a couple of mobile classrooms so knowing that they're a special location, spent a while trawling the forums for previous threads on the subject but not much information to be had. Did suss...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock