Recent content by Stuy

  1. S

    Inspection and Testing.

    Thanks very much for posting Stspark much appreciated.
  2. S

    Inspection and Testing.

    Thanks Richard it is an industrial premises and a new wiring installation was carried out for my company moving in. We don't hold those original test certs so I don't know what was agreed. As I said to Westward10 doing 33% every 3 years leaves some circuits untested in our DB's for 9 years...
  3. S

    Inspection and Testing.

    Thanks for your reply westward10. Yes 100% done as it was a new installation for my company moving into the factory. 33% was then done every 3 years which means there will be circuits in the DB's that have not been tested for 9 years. We received a quote from the company that have been carrying...
  4. S

    Inspection and Testing.

    Hey All My company are due for there 3 year (Industrial) fixed electrical test. An initial full test was done on about 20 DB's 9 years ago then 1/3 of every board has been tested every 3 years since. I thought that a full test would have to be carried out on each DB every 3 years...
  5. S

    Filling in Electrical Installation Certificate

    Thanks for the help Richard much appreciated
  6. S

    Filling in Electrical Installation Certificate

    I've never filled in an Electrical Installation Certificate before and just need to query something. The circuit to be tested is a supply for a 3Ph machine. The machine is supplied from a DB which is fed from a Section Board which in turn is fed from a Main Section Board.Section Main Switch /...
  7. S

    Filling in Electrical Installation Cert

    I have never filled in an Electrical Installation Cert before and just wanted to clarify a couple of things. The new installation is a supply for a 3Ph machine. The supply for the machine is from a DB which is fed from a Section Board which in turn is fed from a Main Section Board1:Is the Main...
  8. S

    Fused connection unit in a toilet block

    No supply is from DB straight to a FCU beside hand dryer but within touching distance of a sink albeit outwith 300mm from the edge of the sink
  9. S

    Fused connection unit in a toilet block

    Yeh something like that Adam lol
  10. S

    Fused connection unit in a toilet block

    I have limited space in the toilet block and was unsure where I could mount the FCU with it being near a sink.I thought that there might be a reg as there are regs on special locations bathrooms ect and zones within bathrooms.Just wanted to check with others before I started.
  11. S

    Fused connection unit in a toilet block

    Hi guys just wondering if someone can help me out here. I've been asked to install a metal hand dryer in a toilet block but the fused connection unit for it will fall within touching distance of the sinks.I've had a look at the regs but I'm still a bit unsure.Will the FCU need to go above the...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock