OP
Spudnik
I have recently renewed a CU on a TT system.
100mA RCD as main switch in meter cabinet with wylex rewireables.
Therefore converted to PME, new, dual RCD CU, left 100mA in situ.
Couldnt really see the point in ripping that out and replacing with a main switch.
100mA RCD as main switch in meter cabinet with wylex rewireables.
Therefore converted to PME, new, dual RCD CU, left 100mA in situ.
Couldnt really see the point in ripping that out and replacing with a main switch.