The less said about fire alarm installers, the better.Fire alarm system, thank goodness I didn't have to work on it. only one conduit is bused into the control panel, 3 have female adaptors but no bush, one is just poked in and has a cable tie around it. The less said about the dangling pcbs the better. View attachment 110786
The conduit to the call point has no fixings other than the female adaptor in the top of the box.
View attachment 110787
You forgot, hand on chin and slow head shake from side to side, tends to happen with all trades though.The less said about fire alarm installers, the better.
Most turn up on site swaggering like the fourth emergency service, suck air through their teeth and then turn out rougher work than most people would think possible.
Hands on hips for fire alarm installers.You forgot, hand on chin and slow head shake from side to side, tends to happen with all trades though.
I used to be work in this area and I agree! Though I did more fault finding and rectification than installing.The less said about fire alarm installers, the better.
But i was assuming the box was attached to the cpc.
do you think there is a need to bond the pipe, assuming the cable comes into the box double insulated?
Personally i was thinking if the flex was secured inside the back box with a cable clamp then the tube need not be bonded, if it is free to move then i think the tube should be bonded.
but I am open to peoples suggestions.
I just had experience of this yesterday.
Was on my ongoing job at a funeral directors where they’ve built a second mortuary inside the garbage they keep the cars in.
There was a smaller room there before, used for coffin storage, and had a smoke detector in it.
Alarm engineer came, disconnected the detector base, pulled out the cable back to the call point and put the EOL in the call point.
Now the new room has been built, although a little bigger floor area and height, the same engineer turns up to “put the detector back on”
He spent over an hour on the phone to his boss asking if this room actually needed a detector or not…. admitted to me that he didn’t really know the regulations…. And seemed to me like he was swerving the job.
10 to 12m of FP200, a handful of P clips and the old base and detector…
To my mind it’s just as much risk as a storage room. More electrical devices, chemicals… staff will be working in there for some time, not just in and out.
“Oh, it’s an install job now.” teeth sucking noises
You could have had it done the time you’ve been on that bloody phone.
Reply to Dodgy trade pictures for your amusement! - 1 Million Views! in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.