Discuss Plasterer - stealing work from honest sparky in the UK Electrical Forum area at ElectriciansForums.net
You have access to isolate it, diss the neutral/line/cpc for the circuit at the CU
What was the planned position of the wall?
Who's fault is it really?
whats up with it?...you`v got barriers n enclosures there....:drunk:Well, was asked to add 10 sockets to a ring and convert a double to a single to make way for the partition wall. Did all the pre-work, only thing left to do was break into ring and convert the existing socket. Was waiting for client to give me date and time to take the power off (its a 10way SP DB with up front RCD) so it meant no servers, no desktop, no phone system, no lights and no kettle ! -
Anyway plasterer had no such issues to deal with...
Any suggestions..... ones i can articulate professionally to client that is :banghead:
View attachment 13950
whats up with it?...you`v got barriers n enclosures there....:drunk:
Come on lads,that finish looks bone dry and he did switch it off.........
Reply to Plasterer - stealing work from honest sparky in the UK Electrical Forum area at ElectriciansForums.net
We use essential cookies to make this site work, and optional cookies to enhance your experience.
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.