Search the forum,

Discuss Signing off work? in the UK Electrical Forum area at ElectriciansForums.net

yes, but they can't notify notifiable works to LABC unless the work is part of an extension etc. where LABC are already involved.
 
Ok thanks.

So if someone has had an extension built and have had additional lighting and power installed to existing circuits, what paperwork is required for the LABC to be satisfied?

Assuming the electrician does not have his own business or registered with a scheme.
 
if new circuits, an eIC is required. if additions to existing circuits, then a MWC will suffice. send a copy to LABC.
 
Thank you.

I'm assuming the electrician would need public liability insurance in the unlikely event of a fire due to electrical work?
 
he'd be a fool if he didn't. not just fire. drilling a water pipe can be a costly experience.
 

Reply to Signing off work? in the UK Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top