Discuss work in progrees in Micro Brewery. in the UK Electrical Forum area at ElectriciansForums.net
What and have some popcorn?
It's a shame Tel let the customer tell him in part how to job a bit of tray or similar to take the cable on over the conduits.I think my criticism was justified. A cable cleat is designed to retain one cable and that cable is not there to support others.
The cost of a job or the budget available should not detract from the requirement to comply with relevant Regulations.It's a shame Tel let the customer tell him in part how to job a bit of tray or similar to take the cable on over the conduits.
I’d rather pooh in my hands and clapI think @camerabloke wants you to be his new mom Westie! Not sure if that’s cute or scary!
It takes a lot of balls to put pictures of your work up for public scrutiny. Constructive critique is one thing none of us is whiter than white on 100% of all jobs not than we would like to be. I think you lot are being a bit hard on Tel if he is using the correct gland out of the packet the shroud may need a bit of heat to make it a bit pliable, do you really think he is going to leave the rubbish on the floor and the cover off the other isolator.
This is one of the reasons why I left my previous employment.The cost of a job or the budget available should not detract from the requirement to comply with relevant Regulations.
I’d rather pooh in my hands and clap
Was the moustache real then?He’s got a nice shoe collection and a couple of wigs AND a gorilla suit - could be a winner!
nail on head. it's ready to go. bit of tidying up to do after xmas, but will tie that in with some extra work he wants doing. he has to plumb in the pumps which are ready wired, then he's brewing.I think you are missing the important bit here which is getting the brewery up and running. Appearance can be worked on later
As I said work in progress just was asking.nail on head. it's ready to go. bit of tidying up to do after xmas, but will tie that in with some extra work he wants doing. he has to plumb in the pumps which are ready wired, then he's brewing.
See posts 33 and 46.Asking what exactly?
they are not out.it's called parallax. makes them seem out.Tel you'll find as I've noticed that the most vociferous critics never,ever post up any photos of work they've done, I rest my case.
However it's a shame that one of those side by side isolators is 5mm higher than the other.
they are not out.it's called parallax. makes them seem out.
Work in progress give the Bloke a chance Lads, he ain't packed his stuff away yet. Jeez talk about putting the boot in. After all nobody is perfect, are they????????
Reply to work in progrees in Micro Brewery. in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.