as said in the tiltle i did my am2 over last 3 days but i went over by 33 mins on my installation, does anyone know if thats a fail.
all my istallatin was elecrically sound and all test results were good, and functional test everything worked, just a bit worried about going over my time.
on...
hi all i have been doing a lot of periodics recently for the housing assocoation and i was amazed at the lack of electrical neglect that i found for instance missing main earth bonds,db covers missing, high ri1 r2 values, high impedance values, ins resistace values of 34 meg, missing covers on a...
I have a customer who has just had a bill land on his mat for £16000 in a year - 55000KWH used according to the meter which has jumped from 27000KWH to 82000KWH in the space of a year on the Normal reading, and the LOW reading has seen an increase of around 15000KWH too.
It's on a farm which is...
done some ceramic tile work today on a new extension (home) when i removed the sockets there was no grommets and no earth link to the steel back box red to brown cable crimped together black to blue crimped together shoved into the back box all cables coming up from the worktop under the kick...
Folks,
New shed CU, 16A & 6A MCBs with integral 30mA RCD main switch. RCD test at 1x is >400ms tho' 180 degree test ok at 18.6ms. That's a fail though yes? Max measured time being >400 ms.
Just asking....don't get RCD fails often. :confused:
Cheers!
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.