S
sparkyork
Hi all
started work subbin for a new company and currently on a new build.
mev system going in comprising extract from kitchen and all wet rooms.
125mm round PVC ducting, elbows etc.
all pipes are individual and go to the loft to a common extraction point where they are exhausted through the roof.
got some crackin hours available so want to make sure it's bang on.
I immediately thought solvent weld but the powers that be we're going the silicone the connection points, screw tap it all together and foil tape around the join route.
ive pretty much got it all in and will be doing the final connections tomorrow, question is do I solvent weld it all up and screw and Tape or silicone etc, don't do it everyday so don't know the potential tips n tricks lol
cheeers
started work subbin for a new company and currently on a new build.
mev system going in comprising extract from kitchen and all wet rooms.
125mm round PVC ducting, elbows etc.
all pipes are individual and go to the loft to a common extraction point where they are exhausted through the roof.
got some crackin hours available so want to make sure it's bang on.
I immediately thought solvent weld but the powers that be we're going the silicone the connection points, screw tap it all together and foil tape around the join route.
ive pretty much got it all in and will be doing the final connections tomorrow, question is do I solvent weld it all up and screw and Tape or silicone etc, don't do it everyday so don't know the potential tips n tricks lol
cheeers