mickys86

I had a bad day yesterday and was just gonna forget about it but I wanna know if it was just me.

Before I start I just wanna clarify, I didn't listen to the builder in any shape or form. I'm the electrician, not him

So I have to wire the kitchen. It is only the third kitchen I would've have wired and I'm still learning. The last kitchen I did was a couple of weeks back for the same builder, same client. they are very good clients who gives my boss an awful lot of work. The last kitchen plan I was given was on a piece of plasterboard. Just scribbled down. It was all fine but when they came to fit the kitchen, with the plaster board and plaster they was out by 150mm so there was a bit of a balls up.
This time they didn't want that mistake so the kitchen plan is coming after the plasterers are done? I was told the oven is going there, microwave is going there, fridge there and dishwasher is either on that wall or that wall. Can you put in two supplies just in case. He just pointed at the spaces and gave no measurements.
The other problem was that they don't want any isolator switches on show, they want them in the cupboards. My boss isn't best pleased but compromised that they go in cupboards next door to appliances but on the side close to the cupboard doors so they can't ever be blocked in, how can I do that when I don't know where the cupboards are.
Also I wasn't given any information on the appliances, ie the hob or oven or microwave oven so how do I know what cable to run in?
I spoke to my boss and he said you can't do it without the plan. And he said not to run in two supply points for the dishwasher. The builder just told me to stop being a prat and get on with it. Coupled up with being tired, yesterday wasn't my best day.
That being said I feel better knowing I can chat to you guys and I'm still looking forward to going to work on Monday :)
 
What do they expect you to do,for goodness sakes its simple on there side,they give you a layout with dimensions on a kitchen plan or they give you a crystal ball,have a couple of beers and feel in in the knowledge that you are not the only sparks who this will happen to,so if we give a builder a bit of platerboard and say build a house based on what we have jotted down would he accept it,i guess not,anyways its saturday,get some beer down,builders the prat,he should know that helping make your job go smoothly makes his go smoothly too,everyones happy
 
Ahh the owld smoke packet job, had a few of them, best thing to do which is what i do is get the customer/builder to mark on the walls where its going, then on a piece of paper write

Builder specified dimensions of where electrical outlets should be placed, electrician takes no responsibility if incorrect and charges will incur for alteration

Signed by both parties
 
When I do a kitchen I draw the entire kitchen out on the walls so i know whats going where. Impossible to do without a kitchen plan, should of just walked away
 
Ahh the owld smoke packet job, had a few of them, best thing to do which is what i do is get the customer/builder to mark on the walls where its going, then on a piece of paper write

Builder specified dimensions of where electrical outlets should be placed, electrician takes no responsibility if incorrect and charges will incur for alteration

Signed by both parties

Yep, i get client to mark an X written on it is whatever is required, no X, no wiring simples
 
As already stated give the builder a can of spray paint and he can mark the points. Take a few photos of his markings and start chiseling, that way when everything's six inches out of place you can get him to remark the stuff whilst he's signing the variation orders with his other hand :)
 

Reply to Bad day yesterday in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Hi all. So I'm designing my new kitchen and trying to plan where things will go. I currently have a 6 switch panel for the appliances (hob...
Replies
18
Views
1K
Doing some work in a commercial restaurant/kitchen the builders had already boarded and plastered the walls meaning my only viable route is to use...
Replies
31
Views
1K
Hi, I am Currently in the process of building an extension and my builders will shortly be getting their electricians to commence the first fix...
Replies
6
Views
449
Hi, Just been scratching my head about this one and wonder if I've missed anything. A few weeks ago I installed a new circuit for a 3kw oven and...
Replies
6
Views
877
Hi I have an electrician over and he took over from an incompetent builder. The builder already installed the wiring but the electrician told me...
Replies
22
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock