- Reaction score
- 1
On a TN system , i want to bond the structural steel on a farm shed. But the submain across to the farm shed is only 10mm Twin and Earth, so only a 4mm cpc is supplied? I was going to install a 10mm cpc to the steel from the local shed db? any help please.