@sedgy34, you have to remember that you are in the old Central Networks area, now Western Power Distribution and they are probably the easiest DNO of all to work with.
 
in my training manual for niceic solar course i did a year ago it says

when installing a pv system under g83/1 for single installations the relevent dno must be notified at/before commisioning then g83/1 appendix 3 paperwork handed in before 28 days from install and this is what i did notified them that i was installing a 4kw system with a g83/1 inverter is this not the case? has this changed
you want to have some words with NIC, as it's not been like that for several years.
 
@sedgy34, you have to remember that you are in the old Central Networks area, now Western Power Distribution and they are probably the easiest DNO of all to work with.

I wouldn't go that far some there are jobsworths and take the 45 days cause they can to get back to you
 

Reply to Dno nightmare what do i do? in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top