S
Sparkii
Hey guys,
I'm looking at a job just now and im a little unsure about the main bonding of incoming services. At the moment it's a large industrial unit and the plan is to make 11 smaller units that will be rented out. Each will have it's own 3ph board supplied by 40A isolator, gas meter and water meter. Do i need to bond the services in each unit from each DB, or would an earth from the main earth bar to the services as they enter the building be sufficient? All pipework in the building runs through each unit at high level and drops down to the individual meters
Thanks in advance
I'm looking at a job just now and im a little unsure about the main bonding of incoming services. At the moment it's a large industrial unit and the plan is to make 11 smaller units that will be rented out. Each will have it's own 3ph board supplied by 40A isolator, gas meter and water meter. Do i need to bond the services in each unit from each DB, or would an earth from the main earth bar to the services as they enter the building be sufficient? All pipework in the building runs through each unit at high level and drops down to the individual meters
Thanks in advance