- Reaction score
- 411
I agree that it's best to do an EICR before a CU replacement, but is there an actual regs that dictates that an EICR 'must' be conducted prior to a CU change?
Discuss EICR requirement prior to CU change? in the UK Electrical Forum area at ElectriciansForums.net
No it's a recommendation via a best practice guideI agree that it's best to do an EICR before a CU replacement, but is there an actual regs that dictates that an EICR 'must' be conducted prior to a CU change?
Be lucky to get £15 a cct around here(YorkshireDepends on location
On average approx £30 per circuit
Also, make it clear.There's two options.
Price in the cost of an EICR to the CU change quote (which you won't get because you'll be too expensive).
Or
Quote the CU change without an EICR, but note on the quote that rectifying any faults found are charged extra.
I was just wondering; most of my CU changes were for small or standard sized properties. I couldn't possibly factor in the cost of an EICR, and even think I would get the CU replacement.How much is charged for a typical EICR?
You charge Manximum fees, then...“Be lucky to get £15 a cctaround here(Yorkshire) “
One of the reasons I now live in the Isle of Man instead of Donny
LOL.“Be lucky to get £1 a cctaround here and try split a penny (Yorkshire)
Only problem with doing an EICR before a CU change, is the EICR might not recommend replacing the CU.
Reply to EICR requirement prior to CU change? in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.