Install a contactor switch, one supply from the db to the switch, wire all the showers from that. That way only one shower can operate at once.


This sounds pretty complex...

Do you mean a contactor for each shower incorporating n/o & n/c contacts to break feeds (to other showers) as necessary?

Or am I missing something simpler?

Please explain
 
This sounds pretty complex...

Do you mean a contactor for each shower incorporating n/o & n/c contacts to break feeds (to other showers) as necessary?

Or am I missing something simpler?

Please explain
Seems overkill doesn't it, if you need three showers in a house then I would ask the local provider for A 100 amp supply myself, Contactors whatever next, relays and start stop units in the lounge lol.
 
You can get shower priority units that are popular in Ireland but not GB that do the same as Kate's excellent idea.
2NO and 2NC contactors could also be used but cost will escalate.
Also remember that even though diversity is not permitted a 60A fuse will take 98A for about 2.5 hours before blowing, so the fuse will not blow with ten minute showers even if they are all on at once, however if you can just make sure only 2 are on at any one time then an 80A fuse should suffice (if you have 7.5kW showers).

Plumbing is the best option as said many times above.

Thanks for your advice. Yes I had originally thought a pumped shower was what we would install, but given it has to have a dedicated, ideally 28mm supply, and the house layout/distance, that option proved prohibitively expensive.
 
Diversity is about common sense. I don't understand why the regs would say not to apply diversity to multiple showers when there could even possibly be a house where there's more showers than people.
 

Reply to Main fuse upgrade and associated issues in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

90s house electric issues continues 🥲 So after getting some good advice here I've managed to sort out some of the heating issues so thank you...
Replies
2
Views
213
Hi, We are renting and have a electric shower downstairs (extension) - a 9.5kW Triton T80Z fast-fit electric shower as well as a combi boiler...
Replies
34
Views
4K
Hi all. I have been asked to take over a job an electrician has started, and has moved abroad. The house is a big mansion, with a 3PH supply...
Replies
49
Views
4K
D
Hi, I have received conflicting advice about Main Isolator Switches and would appreciate forum member's help to plan a way ahead. Looking to the...
Replies
5
Views
2K
Deleted member 155212
D
I'm having an extension built and the builder leading the project has said that the electrician will be over in about 4-6 weeks to start his works...
Replies
4
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock