Came across a very strange circuit set up today and was wondering if anybody had seen anything like it before. I will state now that this is not a UK installation so BS 7671 might not be applicable. OK we have six lighting circuits with 4 fittings per circuit each controlled by a 1 gang 1 way switch (very simple so far). Each circuit is fed via a 15A 3871 MCB but is fed from 2 seperate DB's. For example lighting circuit No. 1 is fed from DB 1 circuit 1L1 and also DB 2 circuit 1L1 and lighting circuit 2 is fed from DB 1 circuit 1L2 and DB 2 circuit 1L2. The neutral for the circuit only comes from DB 1. The circuits are all wired in pvc insulated cable within galvanised conduit and trunking. I have attached a schematic drawing for 1 circuit to try and give a clearer picture of the set up. I hope someone can explain this as it took me about 4 hours today to isolate the damned things as the 2 DB's are not even close to each other and i hadn't got a clue that they were fed from different sources. :mad2:
 

Attachments

  • image.jpg
    81.9 KB · Views: 209
I can't see the diagram, but only one dis board should be feeding it ,presumably the one that also has the neutral in. Maybe at some point they cut power to one board and temporary fed them from the other board and forget to remove.
 
I would be of the opinion that it may of been from an old emergency backup system, which might of been modernised i.e. originally having a secondary back-up source (Battery or similar) and then if the building underwent a modernisation, instead of tracing all cables, they installed 2 DB's to new supplies and on they went. It doesn't make any other sense to me as it's not practical to have two sources unless one is a back-up in the case of an emergency? Does this help?
 
I would be of the opinion that it may of been from an old emergency backup system, which might of been modernised i.e. originally having a secondary back-up source (Battery or similar) and then if the building underwent a modernisation, instead of tracing all cables, they installed 2 DB's to new supplies and on they went. It doesn't make any other sense to me as it's not practical to have two sources unless one is a back-up in the case of an emergency? Does this help?

That was my original thoughts but both DB's are backed up by a stand by gen set as they originate from the same panel board.
 
Last edited:
That was my original thoughts but both DB's are backed up by stand by a stand by gen set as they originate from the same panel board.

Well on this note I have to go with the 'Helping the circuit out' excuse...story behind this being...at my factory there was a spark who used to put a strand of copper across rewireable fuses to 'Help it out' LOL. No one ever understood his theory before he was so unfortunately made redundant
 
and the point about the picture is that the woman who does the history documentary stuff on TV is well fit....as is the tally-ho bird off the crabbies ginger beer advert and her who was in foyles war n all that ....

don't get me wrong, Lilly cole etc= whoah, but geeky bird would deffo.....

I do say....spiffingly good...I should say....
 
Seems very odd have never come across that before I'd just disconnect a live job done :) btw what app did you use for your schematic drawing I'm impressed :)

I have, and on my own house in Cyprus too!! lol!! The electrician had wired the stair lights with a feed from both CU's!! An obvious mistake, but easily done if not thinking straight on a Monday morning!! lol!! In Cyprus, on most house's of 3 bedrooms and above, they install an additional CU on the landing for the upstairs power/lighting... (And my house is on a 3 phase supply, as are both the CU's!!)

And another reason why i don't like to see 2 CU's in a standard sized property....
 
The only time I have seen anything like that is in TSB Banks probably 20 years ago where some special circuits are fed by essential and non essential supplies, but the switching arrangement was catered for this, when one supply was killed the other then took over but control gear was in place to stop back feeding, I didn't get too involved with it as I was helping another spark on the job at the time not running the job, that set up you have shown Sintra is dangerous by the look of it and needs disconnecting from one board, it looks strange for sure, is there anything else connected before the switch on one of the feeds?
 
No mate straight from the 2 MCB's to the switch. Guys have been tracing out all the lighting circuits on one floor this weekend and they are all fed from 2 MCB's will pop up a wee drawing in a few minutes.
 
That looks to be intentional.
A fail safe back up for the wiring installation, with no switching between the 2 required.

It must be a Hospital or High security building, Prison maybe??

If it's not the U.K it must be permitted and must be familiar to persons who normally work on that type of system
 
Have to meet the premises officer and the facilities manager tomorrow afternoon so hopefully they will be able to shed some light on it.
 
This setup is used on railway in places for essential equipment. Delve into it further before disconnecting, if its only lights tho I can't see why it would need to be! Is this building domestic or commercial?
 
Yes very confusing, I still think it may be an essential / non essential system somehow, (looks that way to me) and due to the generator, seems like it may have something to do with that, but the schematic doesn't make sence and seems almost dangerous, sorry fella, I don't think I can help with this one and it mut be something we UK sparks don't get involved with, hence the confusion, maybe tony or E54 may have an idea when they see the drawing Fella.

Mike
 
Yes very confusing, I still think it may be an essential / non essential system somehow, (looks that way to me) and due to the generator, seems like it may have something to do with that, but the schematic doesn't make sence and seems almost dangerous, sorry fella, I don't think I can help with this one and it mut be something we UK sparks don't get involved with, hence the confusion, maybe tony or E54 may have an idea when they see the drawing Fella.

Mike

Cheers mate seems a bit dangerous to me also that's why I'm going to get to the bottom of it.
 
Seen it and installed it where two or more substations would be linked for ancillary power and lighting. Mind you I did fit change over switches on the inter-linking feeds. As we pulled the 11KV cables in a couple of 433V cables would go in at the same time.
 

Reply to Really confused in the UK Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock