Hi.
Three new circuits on one of my first proper jobs.
I hold the previous electricians (2 years ago) EIC.

On my Generic Schedule of Test results, might one simply list the other circuits (The ones I am not touching or testing) in the correct order so the form is less confusing, then add Remarks such as: "Not tested, see EIC/Extent of Installation".

This seems sensible way to do it, but if there is a convention for adding detail of untouched circuits on SOTR where an addition is made to the existing installation, then do let me know.

Thanks,
 
Hi.
Three new circuits on one of my first proper jobs.
I hold the previous electricians (2 years ago) EIC.

On my Generic Schedule of Test results, might one simply list the other circuits (The ones I am not touching or testing) in the correct order so the form is less confusing, then add Remarks such as: "Not tested, see EIC/Extent of Installation".

This seems sensible way to do it, but if there is a convention for adding detail of untouched circuits on SOTR where an addition is made to the existing installation, then do let me know.

Thanks,

No convention really, what you suggest is perfectly acceptable.
 

Reply to Schedule of test results where an addition to existing installation is made in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

Hello, I am in the process of training to be an electrician and have a question. When filling out a EIC for a new circuit am I required to test...
Replies
2
Views
1K
happysteve submitted a new resource: Circuit details + test results - extra sheets for EIC/EICR - BS7671 2018 + A2:2022 - Fillable circuit...
Replies
1
Views
1K
Hi guys, I've gotten AI to write up a terms and conditions for my company and then went through it with AI and tweaked it to make it sound a...
Replies
3
Views
411
I've started to move over to AMD 2 forms for my CU installs, if only because the schedule is so much easier to tick and I can stop sticking labels...
Replies
4
Views
1K
I'm planning a replacement for my existing domestic CU and would like to have it sanity checked before I get an electrician involved. The main...
Replies
33
Views
4K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock