S
sammarkbryan
hello,
bit of a query, ive done the solar pv course but dont ever remember talking in depth about putting the array on an outbuilding that has its own distribution board, if we take the supply to the board in the out building the generation meter will obviously need to go in there aswell, would it make any difference doing this rather than running a seperate swa back to the origin in the house? i cant see why it would as the array is still genereating the electricity into the grid? just not sure, any help would be much appreciated! thanks
sam
bit of a query, ive done the solar pv course but dont ever remember talking in depth about putting the array on an outbuilding that has its own distribution board, if we take the supply to the board in the out building the generation meter will obviously need to go in there aswell, would it make any difference doing this rather than running a seperate swa back to the origin in the house? i cant see why it would as the array is still genereating the electricity into the grid? just not sure, any help would be much appreciated! thanks
sam