OP
Meggerman
Because a lot of the time they will fill it with insulation and it makes it easier.
I would rather use fast fix boxes as a last resort
What a waste of time that is. As soon as 1st fix carpentry is complete, then 1st fix plumbing and electrics start. I wire it completely before they board it. They pull them through and I cut dry boxes in. I