Evening all,
Been to a job on Fri where the customer had a condition report completed. Two of the remedial identified was that there were too many spurs off spurs on the upstairs and downstairs circuit. There’s are separate circuits both rings which test okay etc. I looked at upstairs one first found the naughty spur off a spur and made it right by putting a fcu before the spurs. However the downstairs circuit there must be a junction box under a tiled floor. I can see where cable changes colour and have traced cable with wander lead but cannot see where that join is. I thought about splitting circuits into two separate radials on 20amp . However board is full. Customer does not want floors up etc at the moment (not particularly helpful either )but I do not want to leave this circuit on 32 amp so could change to a 20amp mcb just to protect cable.
Anyone got any suggestions
Been to a job on Fri where the customer had a condition report completed. Two of the remedial identified was that there were too many spurs off spurs on the upstairs and downstairs circuit. There’s are separate circuits both rings which test okay etc. I looked at upstairs one first found the naughty spur off a spur and made it right by putting a fcu before the spurs. However the downstairs circuit there must be a junction box under a tiled floor. I can see where cable changes colour and have traced cable with wander lead but cannot see where that join is. I thought about splitting circuits into two separate radials on 20amp . However board is full. Customer does not want floors up etc at the moment (not particularly helpful either )but I do not want to leave this circuit on 32 amp so could change to a 20amp mcb just to protect cable.
Anyone got any suggestions
Last edited by a moderator: