Hi people.

Here's one for you.



Problem with a boiler change. Engineers changed an Ideal FF250 classic system boiler, to an Ariston Evo System boiler. (System boiler to system boiler)

FF250 classic is 3 wire boiler and all that there is a 3 core flex which went into L N E (L being switched live from 3 port valve basically).


For the new boiler, it requires a Permenent Live, Neutral & Earth from the 3A FCU, so I done that. The existing 3 core I was talking about can now be connected to SL on boiler. Simple...

However, no SL. AKA, no 230 volt switched live at all. The boiler terminal for the switch wire are 24 volts or voltage free. Now, I know it is possible on an S plan heating system to use the grey and orange on the 2 port valves as the volt free connections.


But how on a three port valve? Stumped.

Thanks if you can help.
 
It tells you in the boiler instructions that you'll have to use a relay, But it is suggesting that a y plan system isn't ideal, also if it's got a unvented cylinder you must have a two port valve before the cylinder, hence instructions telling you to put 2 2 port valves in

NOTE: THEUSEOFA‘Y’PLANSYSTEMISNOTPOSSIBLEWITHTHECLASHE SYSTEM
BOILER DUE TO THE LOW VOLTAGE SWITCHING OF THE APPLIANCEUNLESS SUITABLE RELAY CONTROLS ARE USED.

 

Reply to Y plan heating system. Boiler Change Problem. in the Central Heating Systems area at ElectriciansForums.net

Similar Threads

I had to wire in an extra 2 port valve today to protect a newly installed unvented cylinder (replacing the old gravity fed one) in a standard Y...
Replies
12
Views
2K
Hello, I hope you are well, I have fitted a few Nests but only to Combi, S and Y plan systems just been looking a job where I’m doing the kitchen...
Replies
9
Views
2K
I've always thought I was quite good a wiring heating systems, I can do Y plan, S plan, UFH set ups, "normal" thermal stores etc, you name it and...
Replies
4
Views
952
Hello there, I’m in the process of mapping out a relatively standard S-plan system for my parents central heating and hot water system. Not sure...
Replies
10
Views
2K
I have a fully pumped Y plan heating system using a Potterton EP2 programmer. Drayton MA1 Diverter valve. I have just replaced the Actuator head...
Replies
4
Views
619

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock