Good memories of Brush gear up until the last switchboard. Contractors put the board in and two of us for the company inspected it. The result, a check list of abysmal failures. The board was replaced with a GEC unit.
1970 was the official date but it could be years either side. As an apprentice I was using imperial cable, we weren't clearing the stores because of an EU dictate.
I made light fittings using gas pipe. A local machine shop made conduit to gas pipe adaptors for me for about £1-50 each.
Marvo did the same a few years back as I recall.
AHJ inspectors have the final say. Talking to them first makes sense to me.
I’m a retired industrial engineer with an interest in international regulations/codes.
Before you or your licensed electrician do anything talk to the AHJ.
Some panels will take a double lug making a sub panel easy.
If the AHJ red tags the install it’s going to cost a lot more.
I spent much of my time before I retired behind a desk pen pushing and I hated it.
OK I was doing mainly R&D (wreck and destroy) work which was interesting.
Learn how the process works before telling someone else how to do their job.
Have a look at section 250 in NFPA-NIC 2017
Areas with any livestock require special attention to earthing. Ufer or peripheral earthing would be my choice.
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.