Recent content by csm86

  1. C

    RCD's in office

    Potentially there could be 15 computers on each circuit, due to the original configuration.
  2. C

    RCD's in office

    Hi. I have been asked to change a DB in an office that is going to be used as a call centre. The original wiring (which isn't being altered) is T+E in partition walls. With amendment 3 coming in and the removal of "under the supervision of skilled and instructed persons", would I be right in...
  3. C

    Scottish building regs. New Cu.

    I've never heard of needing a building warrant to change a consumer unit in Glasgow.
  4. C

    Wiring Stables

    Hi, first time poster. I have been asked to wire a new build stable and was looking for advice on the earthing arrangements. Scottish power recently brought a PME supply to an external building, I then ran a 4 core SWA with a separate earth into the stables. However I have since found out that...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock