I was once a wet pants doing work through an agency for an NHS subcontractor. The basic electric work would involve the boss asking if anyone was up for doing a specific electrical install job and an agency wet pants says yes I can do that.
The contractor the agency had me working for were...
I would have expected an armoured cable run to terminate at a metal / plastic trunking or metal / plastic cabinet through a gland nut set before the cores reach there final destination of connection.
The armoured cable is a roller coaster run. There is plenty length to connect an uninterupted earth. The cable is salvaged three phase where the yellow has been used as an earth.They were too lazy to cut the sheath back .
Two consumer units and meters. One pair for a flat above a shop and the other set for the shop. The armoured cable rising diagonaly above the consumer unit ajacent to the building electric supply feeds the the shop meter and consumer unit in an other basement room.
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.