Recent content by jason121

  1. jason121

    NEED Legal advice - solar system malfunctioning

    Im from Boston, if you want me to take a look email me [email protected]
  2. jason121

    4Eco/Immersun Stops Trading

    4ECO TECHNOLOGIES LIMITED new company set up this year same directors
  3. jason121

    Inverter replacements by manufacturer - invalidate warranty?

    ABB have started doing this. They have 3 of mine to change. Its been 3 weeks still not done
  4. jason121

    PV immersion controller

    The power reducers are a waste of space. I have had problems with every one installed.
  5. jason121

    What's the largest size array for a 60 amp cable head fuse? Single phase.

    Depends on the DNO. I have never been approved more than 5kw on single phase.
  6. jason121

    Installing PV non MCS

    Yes Mr Worcester. I was called to the install signed off by them before Christmas, due to inverter tripping out in summer. 70m of 2.5mm T/E installed on the AC side.
  7. jason121

    Installing PV non MCS

    There is a company in the UK, MCS registered, who have been issuing MCS certificates if you buy from them.
  8. jason121

    Generation meter for solar panels not working

    Hoe old is the installation ?. Could be still under warranty
  9. jason121

    Grants

    Can anyone tell me if there are grants for air to air source heat pumps. I have an community hall to price for and customer wants to go for air conditioning. I want to go for ASHP with fan assist heaters. Any ideas Thanks
  10. jason121

    SMA Cluster controller

    I tried using the SMA energy meter for zero export. DNO wouldn't let me install the unit, due to the 5 sec lag time before reducing power out put from the inverter
  11. jason121

    Three Phase Enphase

    Yes can be done. I like to use a Laptop plugged into to the gateway which is wireless to the inverters With three phase bring the circuits back to a TP/N board. Try and balance them for the DNO
  12. jason121

    MCS assesment

    Do you have an installation to show the assessor backed up with quote, solar prediction showing irradiance and payback, sunpath diagram, method & risk assessment and structural survey. PV qualifications Insurance You will also need Quality management system in place I m sure I have...
  13. jason121

    FIT change

    Would still be classed MCS and an extension, so the tariff would be in the 50kw -100kw band.9.6 pence The existing tariff would remain unchanged . Would require another meter
  14. jason121

    LG 300w panels

    Solar PV Modules, LG

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock