Recent content by Sb8389

  1. S

    Underfloor heating with air source heat pump

    Different dependant on the air source heat pump? I will be honest the chances of me getting a wiring diagram are slim, I’m under the impression they are thinking we are expecting to know what we are wiring and to get on with it. They think it’s a valiant air source heat pump
  2. S

    Underfloor heating with air source heat pump

    Hi guys We are due to undertake a new build install where they are using air source. Its the first air source I have installed so need a bit of guidance from you professionals, not getting any help or wiring diagrams from the plumber so reliant on your knowledge. The heating system is full...
  3. S

    Emergency lighting in HMO

    This is what I have done and they have designed the lighting plan, my question is on the installation certificate it states there should be 2 luminaries per compartment and he has installed one so I can’t tick that part and the regs state the fire equipment should be illuminated to min 5 lux...
  4. S

    Emergency lighting in HMO

    I have briefly looked at it yes, struggling to find the answers I’m asking, I’m no expert in this field so just want some advice from people with experience.
  5. S

    Emergency lighting in HMO

    Hi guys We have being asked to install some emergency lighting at a 3 storey HMO, the lighting has being designed and it’s basically being designed to include an emergency lights on each landing and one on the stairs with relevant signs to indicate stair level changes, the ground floor has 3...
  6. S

    Rental legislation regarding EICRs

    Exactly same situation I’m finding, i can’t see the whole country getting done (rentals) in the next 2/3 months, I’m just curious weather they will wait till last minute to decide weather to extend or not as I’m sure plenty of landlords will be getting very worried come March time and there...
  7. S

    Rental legislation regarding EICRs

    Hi guys We are currently undergoing quite a lot of EICRs through Letting agencies and finding that they are way behind getting them all completed before the April deadline and they don’t really seem that concerned either ?‍♂️ I’m just wondering weather any of you currently carrying them out are...
  8. S

    Under floor heating over 3kw

    I’m back there on Thursday so going to try and convince them of the potential issues going forward and to install a new circuit, from memory it could be wired in conduit on the outside straight into the garage where the consumer unit is. 2-3 hours work just for peace of mind All round is worth it.
  9. S

    Under floor heating over 3kw

    I do agree He has laid 7 0.5x6m mats and taken all cables back to a single joint box although he did say he cut a couple mats down to 5m so not 100% on the square meters he, he has then run a 1mm from that point to the stat and a 1mm supply from the switch spur to the stat. I don’t really have...
  10. S

    Under floor heating over 3kw

    The stat is rated at 16amp so can carry the load. He has now first fixed all cables so is awkward to see his routes but is pretty self explanatory as his stat is only half a meter from his spur that he’s installed. He has laid the accolade mats he told me so they are 0.5mx6m he has laid 7 of...
  11. S

    Under floor heating over 3kw

    Hi guys Being to a job today where the builder has installed some electric under floor heating Total area is 20.5 m2 The mats are 150w per m2 The total load is just over 3kw. He has first fixed the wiring and checking it he has used a socket wired off the ring main to spur off to a switch...
  12. S

    Hot tub install

    Hey guys This may have being touched on before. I have got to install a 32amp Hot tub for a customer. The installation is a dual RCD board TNCS All bonding in place. I am going to install a 6mm 3core armoured surface cleated to garage wall and the hot tub will be installed behind the garage...
  13. S

    Customer wiring own electrics

    Good point. Would you not be able to highlight what can’t be inspected in the limitations section to cover your a**e
  14. S

    Customer wiring own electrics

    Hey guys Spoke to napit today and they advised to contact building control to see if they would accept an EICR and then he would have to sort part p himself. I spoke to them and they wouldn’t accept this, so I now have to do an EIC and get the customer to sign the design and construction part...
  15. S

    Customer wiring own electrics

    Would an EICR be the only way forward now as I can’t see any contractor signing the work off as their own. Would building control send someone out to do the relevant tests to get their part p certificate. Not sure what’s best to advice him going forward apart from stop being a tight arse and...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock