- Reaction score
- 5,849
Are we saying that the only bit of the split con. causing the problem is the bit less than 50mm in a wall, or is the 1500mm buried section in ducting non compliant as well?
Discuss Time delay RCD or Mechanical Protection in the UK Electrical Forum area at ElectriciansForums.net
Just the bit on the wall at <50mm
Chase it out, cap it with some perspex and add LED running lights...I that case, I'd be adding a bit of trim to the wall in the appropriate place to increase the depth to 50mm+
Reply to Time delay RCD or Mechanical Protection in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.