Search the forum,

Discuss Using a Metrel MFT with a R2 long lead in the Electrical Testing & PAT Testing Forum area at ElectriciansForums.net

Reaction score
22
Hi, how can I connect my Kewtech R2 lead to my Metrel MFT so that I do not have to carry the R2 reel with me whilst doing R2 testing? There was never an issue using a Megger but the Metrel utilises a block connector instead of 3 individual leads.
Thanks
 
Will the wander lead not piggy back into one of the Metrel test leads?

On a side note I use a shoulder strap for my wander lead reel, saves carrying it.
 
As @Strima said, you use the 3 lead set. Plug blue into green and then plug your wander lead into the back of the blue. Then null out the lot. If you’re still confused I can post a picture for you.
 
I've been using a Megger R2 reel with my Metrel for years
 
I always put the drum at the other end so I don't have to carry it. I wind out the lead first to the furthest point. I removed the outer casing as it never wound up properly so I just have a bare drum and the lead manually wound up on it.
 

Reply to Using a Metrel MFT with a R2 long lead in the Electrical Testing & PAT Testing Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top