hi everyone this is my first post,
passed my city and guilds 236 parts 1 and 2 also am1 and am2 back in 1991, and i would like to know if these qualifacations are considered to be equal to nvq level 3 As i,m planning to move to italy and believe they require nvq level 3 to recognise my...
Supposing I have my Main Incomer (4c70mm2) at one side of a very large warehouse.
My incoming water is on the far side.
My Main Earthing bond (35mm2) is from the incomer to the M.E.T.
I am going to equipotential bond my Structural steel close to the M.E.T. (25mm2)
Can I then come off the...
Supposing I have my Main Incomer (4c70mm2) at one side of a very large warehouse.
My incoming water is on the far side.
My Main Earthing bond (35mm2) is from the incomer to the M.E.T.
I am going to equipotential bond my Structural steel close to the M.E.T. (25mm2)
Can I then come off...
I went to college and took my city and guilds, at the end of the first year I found employment and continued the course.
I passed my City and Guilds parts 1 + 2, but now my boss has said I'm not qualified until I do an NVQ3.
Is this right?? If so please tell me how I can do my NVQ3 and how...
I am a new member an have what I think is an interesting question.I have been given a spec for an product which will be installed outdoors and be accessed by the public. The installation requires the fitment of 4x heater lamps. The lamps are connected to 230v ac by means of a plastic junction...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.