- Reaction score
- 669
Sure the "Nest Engineer" knows how RCBOs work and will fix it in no time, so I wouldn't panic too much.
We used to do alot of of heating wiring for school boiler rooms, quite often we would have a 16amp circuit with a isolator Clearly Labeled" near the Boiler to completely isolate the supply and control gear. We then put in inividual fused Spurs for pump and boilers which we could fuse down accordingly, reason we would do it like this is because some of the pumps were pretty big.
I enjoyed it though as got to do a fair bit of metal conduit and play with some relays. Most things are done with PLCs now though.
We used to do alot of of heating wiring for school boiler rooms, quite often we would have a 16amp circuit with a isolator Clearly Labeled" near the Boiler to completely isolate the supply and control gear. We then put in inividual fused Spurs for pump and boilers which we could fuse down accordingly, reason we would do it like this is because some of the pumps were pretty big.
I enjoyed it though as got to do a fair bit of metal conduit and play with some relays. Most things are done with PLCs now though.