Search for tools and product advice,

Discuss A bit of fun, guess the quote in the Business Related area at ElectriciansForums.net

the independent kitchen company I work for charge £750 a day + materials to the customer for electrical alterations, I think the gas man to connect / move any gas pipes is something batty like £500 per half day.

my sister was just quoted £24,000 by howdens to fit a new kitchen , Labour rates must be in excess of £1000 per day
OMG! This is scandalous, I spat out my coffee in disbelief!
 
the independent kitchen company I work for charge £750 a day + materials to the customer for electrical alterations, I think the gas man to connect / move any gas pipes is something batty like £500 per half day.

my sister was just quoted £24,000 by howdens to fit a new kitchen , Labour rates must be in excess of £1000 per day
So what is the material / labour split on that £24,000 and what is the contribution to the chairman and chief execs bonus
 
the independent kitchen company I work for charge £750 a day + materials to the customer for electrical alterations, I think the gas man to connect / move any gas pipes is something batty like £500 per half day.

my sister was just quoted £24,000 by howdens to fit a new kitchen , Labour rates must be in excess of £1000 per day
That's a quote worthy of Winston Churchill.
 
That's a quote worthy of Winston Churchill.

scary thing is she nearly went with it and was seconds away from signing the order when she called me ask if imo was it a fair price

I told her NO, £24 grand is way expensive and to shop around

we did out kitchen 5 years ago using an independent company for £6500 and our kitchen is the same sizes
 
So , took the day off today and fitted my new sink / toilet unity unit

quite a fiddly faffy job as had to cut several bits out of the back of each unit (so bought myself a new jigsaw) so for the pipes to come across but apart from that it went in fine

now all that’s left is to pull up the old flooring , lay new 5mm ply as instructed by the flooring company in readyness for the new LVT

saved myself over £1000 in Labour

Who Needs a Wet Pants
 
And probably a better job as well
100% better

the reason for charging the vanity as the original wet pants whom fitted it 3 years ago bodged it (he cut the pan connector pipe too short, rather than buy a new pipe he stuck 2 sections together with some sort of tape and mastic everywhere so eventually we had a slow drip leak which had dripped inside the unit eventually blowing all the wood at the bottom and rotted the plinth)

useless wetpants and he wasn’t cheap either
 
I will say I thoroughly underestimated how long it would take , I started at 8.00 this morning ripping out and didn’t have the new toilet and sink back in and fully finished until about 6 this evening

I honestly thought I would have taken 3 to 4 hours max , but took more like 10 hours

it would have been a full day for wet pants I reckon
 
I will say I thoroughly underestimated how long it would take , I started at 8.00 this morning ripping out and didn’t have the new toilet and sink back in and fully finished until about 6 this evening

I honestly thought I would have taken 3 to 4 hours max , but took more like 10 hours

it would have been a full day for wet pants I reckon
But how much time was spent / lost going and getting the bits you needed because you didn't have them on your van.
 

Reply to A bit of fun, guess the quote in the Business Related area at ElectriciansForums.net

Similar Threads

Hi all, New homeowner here... hoping it's okay to seek some advice on a quote. I've recently had some wiring done for a new kitchen in a small...
Replies
27
Views
3K
  • Locked
  • Sticky
Beware a little long. I served an electrical apprenticeship a long time ago, then went back to full time education immediately moving away from...
Replies
55
Views
5K
I have let a flat for a several years to the same person (not a new tenancy). Hall, kitchen, bathroom, two bedrooms and lounge. All on one...
Replies
29
Views
5K
Short Version Is it permissible to have 2 feeds to 2 separate consumer units in a detached garage? Is it permissible to run SWA underground...
Replies
15
Views
3K
I know how I was taught to test a RCD, 6 tests in all two no go, two under 300 mS and 2 under 40 mS with no load. But thinking about it not so...
Replies
7
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top