As above, what is the consensus here. If a switch fuse is fitted in an external meter cupboard, does this count as a similar assembly and have to be non combustible?
I've had to do a couple recently and have used the Wylex A3 unit, which is a really nice bit of kit, but its a bit of a beast. Doesn't leave much room for cutout/meter/henley block. Bit of a ballache to be honest.
Have a couple more garden buildings to connect my 3C 16mm2 SWA to shortly. What is everyone else doing?