OP
jjnr78
Recently an NICEIC inspector told me that although GN3 states 100% testing and 10% sampling, the percentage is what ever the customer is prepared to pay for and agree to as long as you state it on the report.
i relly hope that that was a joke (though i fear the worst). its about engineering judgement, and i'm not sure GN3 states those terms in the latest vversion but i havent got it to hand. The point to this case was that BC believed that their appointed contractor was inspecting and testing 100% of newly installed circuits etc for Part P, but it would seem for this job at least, this contractor thought 30% was good enough. £250 was an easy 1.5 hrs work!! whats worse is they still didnt get it right!