uksparks
-
- Reaction score
- 1,228
Hi,
Im not looking for off the track comments etc, but to cut a long story short, I don't know how much to put an invoice for, for a rewire ai did last year, this is the labour side of things, ill break it down.
Basically its my grannys house, I did it out of the goodness of my heart other than parts, but now her life is drawing to an end she wants me to put an invoice into her estate for the full going rate.
Ok, so house is in Northampton, done my a qualified spark etc..
4 bed detached, with conservatory, three phase head, two dis boards, ones a 20 way MK and the other is an Invicta 3.
There's also 4 flood lights outside in trunking and three carriage lamps at the front, full garage install, sockets and lights etc.
11 storage heaters, also an enclosure for contactor and control circuit etc, separate hob and cooker circuits, connect and fitted new over and hob, and plinth heater and extractor etc.
Circuits on the 24 hour board, are as follows:
Circuits on the Night board, three phase are as follows
I did not supply the storage hears, but did supply everything else.
The cost of parts alone with nothing added on was £1950.00 inc VAT
The house is 1960 ish, all floor board, all had just oiver min sockets in each room, all lights re centred, all walls chased and re skimmed in, and all fittings moved to new heights.
What would you say is a fair price if you were quoting to do the job inc parts? Basically so I know roughly what to charge, I have a figure in my head, but want to know your thoughts.
Im not looking for off the track comments etc, but to cut a long story short, I don't know how much to put an invoice for, for a rewire ai did last year, this is the labour side of things, ill break it down.
Basically its my grannys house, I did it out of the goodness of my heart other than parts, but now her life is drawing to an end she wants me to put an invoice into her estate for the full going rate.
Ok, so house is in Northampton, done my a qualified spark etc..
4 bed detached, with conservatory, three phase head, two dis boards, ones a 20 way MK and the other is an Invicta 3.
There's also 4 flood lights outside in trunking and three carriage lamps at the front, full garage install, sockets and lights etc.
11 storage heaters, also an enclosure for contactor and control circuit etc, separate hob and cooker circuits, connect and fitted new over and hob, and plinth heater and extractor etc.
Circuits on the 24 hour board, are as follows:
- Shower
- Hob
- Kitchen & Utility Sockets
- Upstairs Sockets
- Conservatory
- Downstairs Lights + Smokes
- Cooker
- Downstairs Sockets
- Garage Sockets
- Water Heater
- Caravan Power Point
- Boiler
- Upstairs Lights
- Outside Lights
- Garage Lights
Circuits on the Night board, three phase are as follows
- Lounge Heater (F)
- Hall Way Heater
- Lounge Heater (R)
- Dining Room Heater (R)
- Dining Room Heater (F)
- Utility Heater
- Large Fr. Bed. Heater
- Large Re. Bed. Heater
- Small Re. Bed. Heater
- Small Fr. Bed. Heater
- Water Heater
- SPARE
I did not supply the storage hears, but did supply everything else.
The cost of parts alone with nothing added on was £1950.00 inc VAT
The house is 1960 ish, all floor board, all had just oiver min sockets in each room, all lights re centred, all walls chased and re skimmed in, and all fittings moved to new heights.
What would you say is a fair price if you were quoting to do the job inc parts? Basically so I know roughly what to charge, I have a figure in my head, but want to know your thoughts.