- Reaction score
- 801
as above the boiler was moved to a shed when an extension was getting built , now all the pipes leaving the boiler are copper but now are in plastic before hits the ground, would i still have to bond this and would it be bonded from my new board in the shed while the supply is from an exisiting 3036 board.. tn-c-s