B
bfam
Hi All
Job as title. Please quote or request further if required.
Cheers
Job as title. Please quote or request further if required.
Cheers
Discuss Consumer Unit Change in Slough Required in the Electricians Jobs area at ElectriciansForums.net
and agreement on finding and rectifying any issues e.g. shared neutrals, low IR readings, end/end continuity of rings/ DIY bodges. the list is as long as the Titanic is deep. (and that 12,500 feet, or 2,100 fathoms for the mm love children).How do you expect people to quote with that little information?
- pics of original
- earthing arrangement
- number of circuits
- accessibility
- cabling type
- bonding needed
And after that lot the OP has decided it's less risky keeping an old Wylex than having to figure out what we're all harping on about.
I think I'll get a refund from Tradeskills4u
I think I'll get a refund from Tradeskills4u
my tender is in £2,500,000 + sir tel.Be careful Tel you do know there are tenders out for the Buckingham Palace rewire?
i'll do it for £1000. not a cowboy. just expensive.
my tender is in £2,500,000 + sir tel.
Reply to Consumer Unit Change in Slough Required in the Electricians Jobs area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.