sivoodoo
Does the following installation require a fused 13A switched spur before the SWA.
2.5mm T&E from ground floor ring to IP rated box on outside wall.
then
SWA 2.5mm from Ground floor ring to garage unit (40A RCD) 16A MCB.
then
from the garage unit to two metal clad double socket outlets.
Thanks
2.5mm T&E from ground floor ring to IP rated box on outside wall.
then
SWA 2.5mm from Ground floor ring to garage unit (40A RCD) 16A MCB.
then
from the garage unit to two metal clad double socket outlets.