- Reaction score
- 17,126
AFAIK, bonding conductors have to be continuous and within 600mm of point of entry.
You might want to try reading the regulations at some point.
Discuss Does this need to be bonded in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net
AFAIK, bonding conductors have to be continuous and within 600mm of point of entry.
When did that change??????????
I don't think it has changed, as far as I can remember there hasn't been a requirement for a continuous conductor since I started my apprenticeship 20 years ago. And I'm pretty sure 600mm hasn't been much more than a suggestion in that time either.
Wasn't it mentioned in the guidance note rather than the regs?
I've got a feeling it was something made up by the NICEIC
It is in the earthing GN but not supported by a Regulation.
Not in the 15th but I can't go back further than that.
Reply to Does this need to be bonded in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.