Been told by our DEA today that their governing body is insisting that do a second site visit to confirm that panels have been installed. Photos, MCS certificates etc are NOT acceptable. This has effectively doubled the cost of an EPC to us as many of our jobs are marginal and we need an indication before we commit to the install.

Phoned another DEA and got the same response. They had a warning this week apparently that will be struck off if they do not do a second site visit.

Anyone else heard this?
 
Why not just find one that will do it without a second visit, who will know if they have been there twice, or maybe driven past to see some panels on the roof.
Also I understand that the "rules" vary depending on who they are registered with.
 
it's a complete pile of p00 is what it is, and probably illegal IMO.

the EPC assessor is allowed to accept stuff like the paperwork from an insulation firm as evidence that cavity wall or internal insulation has been carried out, so there should be no reason at all why they shouldn't also be allowed to accept an MCS certificate and photo from an accredited solar PV company as evidence that the solar PV system has been installed.

IMO this is all just another method of them trying to stop companies sending the paperwork in prior to an install being completed as the FIT deadline approaches.
 
Why not just find one that will do it without a second visit, who will know if they have been there twice, or maybe driven past to see some panels on the roof.
Also I understand that the "rules" vary depending on who they are registered with.

I think they require date-stamped photos as evidence that everything has been observed on the same visit.
 
you dont have to be DEA to work out if its going to pass or not and if it doesnt get a D you start looking at draught excluders and loft insulation, and a thermal insulation round the hot water tank if its not got one.
 

Reply to EPC - Goalposts moved again... in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

Similar Threads

Hello, Looking for some advice following a botched 3 phase upgrade today. Some background: Commercial unit originally fitted out (4 years ago)...
Replies
7
Views
676
Hi all, Just to be clear, I'm not looking for advice on upgrading but rather just clarification of our existing setup. We need to upgrade the...
Replies
12
Views
1K
My solar panels and battey system were installed and MCS certified back in 2016. unfortunately the installers went bust not long after the install...
Replies
3
Views
1K
Hi guys & gals, I gave in and bought the new Megger MFT-X1. Got my hands on it Friday night, had a little play with it, used it at work on Monday...
Replies
10
Views
4K
Hi All Let me start by saying I have my 2365 level 3 but never worked in the industry so my knowledge is limited. My partner and I recently...
Replies
22
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock