I have a job where SEC are moving the mains cable for the property to allow for change of use of the area. This means that the tails from the new meter box will be through a wall and over 3 mts long. Therefore a Switch fuse /isolator will be required in the new meter box. Does it require the facility for SEC to put their meter seals on the enclosure of the Switch fuse / Isolator ? The one I was offered at suppliers did not have this facility. What do others fit in this situation?
Thanks, AdieB
Thanks, AdieB