Hi, I'm currently in the 2nd year of my electrical engineering HNC and trying to complete my project but feel like I'm going in circles.
My premise is that I'm replacing 35 fluorescent lights that are energised for 24 hours per day for LED fittings and a new switching arrangement containing PIR sensors and possibly a contactor. The aim being to show the reduction in running costs and increased energy efficiency.
Does this seem like a strong enough idea? I keep getting caught in 2 minds that it is, and then isn't. And it's also not something I can actually install, which is proving to be an issue.
Not sure if there is anything I could change it to at this late stage (about 2-3 months left), or if anyone has any ideas to make my project better??
Only other thoughts were to maybe set up a fault finding test board for electrical students, which could be relatively simple to achieve??
Any thoughts would be much appreciated.
 
Hi, I'm currently in the 2nd year of my electrical engineering HNC and trying to complete my project but feel like I'm going in circles.
My premise is that I'm replacing 35 fluorescent lights that are energised for 24 hours per day for LED fittings and a new switching arrangement containing PIR sensors and possibly a contactor. The aim being to show the reduction in running costs and increased energy efficiency.
Does this seem like a strong enough idea? I keep getting caught in 2 minds that it is, and then isn't. And it's also not something I can actually install, which is proving to be an issue.
Not sure if there is anything I could change it to at this late stage (about 2-3 months left), or if anyone has any ideas to make my project better??
Only other thoughts were to maybe set up a fault finding test board for electrical students, which could be relatively simple to achieve??
Any thoughts would be much appreciated.
I think it's not a bad Idea.

Give an abstract or summary of what your project entails.
Detail the calculations and their basis.
State any assumptions made.
List any sources you used to get data that supports your case.
 
I think it's not a bad Idea.

Give an abstract or summary of what your project entails.
Detail the calculations and their basis.
State any assumptions made.
List any sources you used to get data that supports your case.
Thanks, that's where I'm struggling - the report side of things. Feel like I'm over complicating the report to compensate for it being a fairly simple idea. I've basically calculated the running costs of the existing system and compared that to my proposal, with a few graphs thrown in. Not sure what else is required??
 
Thanks, that's where I'm struggling - the report side of things. Feel like I'm over complicating the report to compensate for it being a fairly simple idea. I've basically calculated the running costs of the existing system and compared that to my proposal, with a few graphs thrown in. Not sure what else is required??
Maybe show the basis for your calculations. What is your source for claiming better efficiency? How would you validate it?

Just some thoughts....
 
Thanks, that's where I'm struggling - the report side of things. Feel like I'm over complicating the report to compensate for it being a fairly simple idea. I've basically calculated the running costs of the existing system and compared that to my proposal, with a few graphs thrown in. Not sure what else is required??
Any paper project I was involved in required an Installation and Maintenance Manual, you know the sort of thing :schematics:descriptions of the equipment used, lighting, PIRs, Contactors, tyoes of cable used, basically a manual describing how and why you opted for what you have decided on, to allow any future engineers involved in any Maintenance issues can refer to the Manual, make it as comprehensive as you can, and good luck
 
You might throw in some of the complexities of LED in terms of initial draw currents, albeit micro seconds, and consideration of switching gear and the need for current limiting devices and blind them with science. There is a lot of considerations in just those areas alone if you care to put your magnifying glass on it. For instance relays weld shut sometimes with initial draw currents. Also consideration of emergency lighting and standby lighting in an LED context compared and contrasted with Flourescent equivalents.
 

Reply to HNC electrical engineering project help in the Electrical Engineering Chat area at ElectriciansForums.net

Similar Threads

This isn't really an electrical issue as such but I know you guys are pretty tech savvy and familiar with all the latest and greatest...
Replies
13
Views
1K
Replies
1
Views
2K
Hi all. I have been trying to do some reading up on my options for possibly doing a HNC next year. I had originally looked at doing a HNC in...
Replies
8
Views
4K
I'm looking for some first hand advice and opinions from anyone who has completed or is currently studying a HNC Level4. Thinking about making...
Replies
9
Views
4K
Im interested in some further education. I am really interested in electrical engineering. The problem is I'm not sure if to go down the HND or...
Replies
34
Views
10K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock