1) I will need a team of sparks befor I’m finishe 2) no I don’t, I have always proved cables at one end or the other or been able to isolate the whole supply. This building is prity vast so when I am sticking my head in places I don’t rally want to go back to and I see a big black cables 2 inch thick I would like a quick way of determining if it’s deep live then I can mark it on the plans. If a volt pen will do volt pen will do it then that will do.. any cables I don’t get a positive result for can get marked up as require further investigation.
However if there is something a bit more reliable than a volt pen I will get one,