I've been asked to install 12 x 2.4kw infared panel heaters in a church. The cable run for the furthest point of the first row of 2 heaters is 44m, next is 40m, 36m, 32m, 28m, 24m. The plan is to have 3 x interlinked thermostats. I've never installed this type of system before and was wondering if anyone had any possible snags, advice for me with regards power distribution? I've worked out that the maximum demand for just this system is just over 125amps....I'm thinking splitting the system over two phases, possibly three?
Thanks guys
I've been asked to install 12 x 2.4kw infared panel heaters in a church. The cable run for the furthest point of the first row of 2 heaters is 44m, next is 40m, 36m, 32m, 28m, 24m. The plan is to have 3 x interlinked thermostats. I've never installed this type of system before and was wondering if anyone had any possible snags, advice for me with regards power distribution? I've worked out that the maximum demand for just this system is just over 125amps....I'm thinking splitting the system over two phases, possibly three?
Thanks guys