- Reaction score
- 453
A nice pv job from a couple of weeks ago .
Tallest roof i have ever worked on at 42 metres which made the dc run difficult .
The ac side was easy in comparison with small short runs of swa . Enjoyed installing out in the sunshine which didn't
last long as the week after it ****ed down with rain and we were in a field doing a ground mount :cry_smile:
Tallest roof i have ever worked on at 42 metres which made the dc run difficult .
The ac side was easy in comparison with small short runs of swa . Enjoyed installing out in the sunshine which didn't
last long as the week after it ****ed down with rain and we were in a field doing a ground mount :cry_smile: